Proof approval checklist
Twelve checks worth completing before a job goes to press: artwork and files, dimensions and color, production and sign-off. Tick them off as you confirm them; the count updates as you go.
Progress
0 of 12 confirmed
12 still to confirm.
Ticks are kept in your browser only. Nothing is sent to Proofscene.
Artwork & files
Dimensions & color
Production & sign-off
The last item is the one that protects you
The first eleven checks are craft. The twelfth is evidence. When a delivery is disputed weeks later, what settles it is not whether the file was preflighted; it is whether you can show what the customer approved, when they approved it, and that the approval was against this version and no other.
That is also where flat proofs are weakest. A customer can genuinely sign off a PDF and still be surprised by the finished piece, because the PDF asked them to imagine the fold, the foil and the finish rather than showing them. Proofscene puts an interactive 3D model of the actual product in front of them instead, on a branded link: you can see whether and how often they opened it, mark it Approved in your library when they sign off, and the link keeps showing the build they reviewed until you publish an update.
Using the checklist
Short, straight answers to the questions we are asked most. If yours is not here, ask.
Ask us anythingWhat should be on a print proof approval checklist?
At minimum: final artwork version, a preflighted press-ready file, adequate image resolution, proofread copy, confirmed dimensions and dieline, bleed and safe area, color mode and named spot colors, overprint and trapping, substrate and grain, specified and positioned finishes, verified barcodes and variable data, and a dated written sign-off against that exact version.
Who should run through this checklist?
Usually prepress or the account manager, before the proof leaves the shop. The last item is the one the customer owns: everything above it is your side of the job.
Is my progress saved?
Your ticks are stored in your own browser so the page survives a refresh. Nothing is sent to Proofscene. Use the reset button to clear it before you start the next job.
Why is sign-off its own checklist item?
Because an approval that is not recorded is not an approval you can rely on when a delivery is disputed. A dated, attributable sign-off tied to a specific proof version is what turns a conversation into documentation.
How does a 3D proof help with these checks?
It makes the checks your customer signs off far easier: dimensions, finishes, substrate and artwork placement are simple to verify on an interactive 3D model of the finished product, where a flat page asks them to imagine it. Preflight, trapping and color specification stay with your prepress team, as they always have.
Can I use this checklist with my customers?
Yes. Many shops work the last few items through with the customer on a call. The whole page is free to use and free to share.
Related: the longer-form print proof approval checklist guide, the artwork approval form template for the sign-off itself, what a proof sheet should contain, how to document customer sign-off, and the reprint cost calculator.
How useful was this tool?
Give the last check something worth checking
Create a free account, upload a proof sheet and send your customer an interactive 3D proof on your own branded link today.
Free account · No credit card · Built by print people