The artwork approval process, step by step
An artwork approval process is the agreed path a design takes from the first proof to a signed-off file the printer may produce: one named approver, a complete proof of one exact version, consolidated feedback, a recorded decision and a frozen approved file. When any of those is missing, jobs pick up extra review rounds before printing or disputes after it.
This guide covers the process as both sides see it, the print buyer approving the artwork and the printer or supplier asking for approval. For the printer's internal prepress stages, see the print proofing workflow; for the record itself, see how to document customer sign-off.
What are the steps in an artwork approval process?
Eight steps cover almost every print job, from a business card to a folding carton. Small jobs move through them in an hour; complex packaging may take a week, but the order does not change.
| Step | Owner | Output |
|---|---|---|
| 1. Agree the brief and the approver | Account manager and customer | Specification and the name of the one person who signs off |
| 2. Preflight the artwork | Prepress | Files checked for size, bleed, resolution, fonts and color |
| 3. Build one complete proof | Prepress or designer | Every side, the shape, material and finishes, with a version number |
| 4. Send it on a single current link | Account manager | One proof the customer cannot confuse with an older one |
| 5. Collect consolidated feedback | Customer's approver | One list of changes from every reviewer |
| 6. Revise and re-version | Prepress or designer | A new proof with a new version number |
| 7. Record the decision | Account manager | Approver, version, date and scope, stored together |
| 8. Freeze and release | Production | The approved file, locked, released to press |
Who should be involved in artwork approval?
Reviewers and the approver are different roles, and the process works only when that difference is agreed before the first proof. Brand, legal, product and regulatory colleagues may all review the artwork, but one named person owns the final decision and has the authority to commit the order. On the supplier side, the account manager owns the proof's delivery and the record, and prepress owns the file's accuracy.
The usual failure is an approval from the wrong person: a marketing coordinator approves, the brand manager sees the printed job and rejects it. Naming the approver up front, and sending the proof to that person, prevents most of these disputes.
What should the proof show before anyone approves it?
The proof has to answer the questions a reviewer would otherwise ask by email. In practice that means:
- every side or panel of the product, including the back, base and inside;
- the finished size and shape, with the dieline or cut line where there is one;
- the material and thickness, and how the artwork sits on it;
- each finish (foil, spot UV, embossing, lamination) and exactly where it falls;
- the job number, version number and date on the proof itself.
A flat PDF can carry all of this, but the reviewer has to assemble the product in their head. An interactive 3D proof shows the finished product directly, which is why it tends to remove the "what does the back look like?" round. The full contents of a proof are in what a print proof sheet should contain.
What goes on an artwork approval form?
An artwork approval form records the decision against one exact version so nobody can later dispute what was agreed. Whether it is a form, a signed PDF or an approval status on a proof link, it should hold these fields:
| Field | Why it matters |
|---|---|
| Job number and version number | Ties the decision to one file, not "the latest one" |
| Approver's name, role and company | Shows the person had authority to approve |
| Date and time | Fixes the order of events if changes arrive later |
| Decision | Approved, approved with listed changes, or new proof required |
| Scope of approval | States what the approval covers (content, layout, finishes) and names the color reference (for example a contract proof) |
| The proof itself | Kept unchanged, so the record shows exactly what was seen |
A ready-made version with these fields is the free artwork approval form template, which you fill in and print or save as a PDF, or download as a fillable PDF or Word file.
The copyable list of checks to run before release is in the print proof approval checklist, and an interactive version is the free proof approval checklist tool.
How do you cut the number of review rounds?
Most extra rounds come from questions the proof did not answer, feedback that arrived in pieces, or an approval from the wrong person. Fix those three and rounds drop on their own:
- Answer questions inside the proof. Show the back, the finish and the real shape so nobody has to ask.
- Consolidate feedback. Ask the approver for one list from every reviewer, so one round makes one new version.
- Send one current version. A single link that always shows the latest proof stops people reviewing an old attachment.
- Count rounds, not days. Rounds per job is the number to watch; how long proof approval should take explains why, and the approval time estimator shows what one round less is worth.
What happens after the artwork is approved?
The approved version is frozen. Production works only from that file, and any later change, however small, becomes a new version with its own approval. Store the proof and the approval record with the job: reorders often start from "print it the same as last time", and the record answers that as well as any dispute. If you approve artwork for cartons and packs, the panel-by-panel review in how to approve packaging artwork online adds the checks specific to packaging.
Where Proofscene fits
Proofscene is artwork approval software for steps 3, 4 and 7. It turns the proof sheet you already make into an interactive 3D proof of the finished product and publishes it on a branded link at yourcompany.proofscene.com. Your customer opens it in any browser, turns the product over and replies with their decision; you see that the link was opened and mark it Approved. A published link keeps showing exactly the build that was published until you publish an update. You can start free or see it working on the live 3D demo.
Artwork approval, answered
Short, straight answers to the questions we are asked most. If yours is not here, ask.
Ask us anythingWhat is an artwork approval process?
It is the agreed sequence a design follows from the first proof to a signed-off file the printer is allowed to produce: who reviews it, in what order, what each reviewer checks, how changes come back, and how the final decision is recorded against one exact version.
How many review rounds should artwork approval take?
As few as the job allows. Each round adds days, so the aim is a first proof that answers the reviewer’s questions on its own: correct specification, every side shown, finishes visible and one named decision-maker. Count rounds per job to see where yours come from.
Who should approve artwork?
One named person with the authority to commit the order, agreed before the first proof goes out. Others can review and comment, but only the named approver signs off. An approval from someone without that authority is the most common cause of a disputed job.
What should an artwork approval form include?
The job and version number, the approver’s name and role, the date, the decision (approved, approved with listed changes, or new proof required), the scope of what approval covers, and the proof itself or a link that keeps showing exactly that version.
What happens after artwork is approved?
The approved version is frozen. Any later change, however small, becomes a new version that needs its own approval. Production works only from the approved file, and the approval record is stored with the job for reorders and questions.
Is an email reply enough to approve artwork?
It can form part of the record, but it is weak evidence when it does not name a version or sits in a thread with several attachments. Ask the approver to approve a specific, numbered proof, and keep that proof unchanged.